In spite of an unusually wet summer, significant progress has been made on the site work. This work includes grading around the building and the installation of many of the water and drain lines. We are drilling the 140 geothermal wells to provide for the heating and cooling of the building.  The service and fire road are also taking shape. Interior work has progressed as expected with the installation of much of the ducting for the fresh air system. The ceiling framing has been installed and electrical and plumbing work continues. We have installed a test area of slate roof to be inspected by the engineers so that we can get the slate on before winter.