As we prepare to install the slate and await the arrival of the brick, the interior of the building is seeing much progress. Ducting has been installed in the attic as well as on the third floor. The metal framing has been completed in the third floor bedrooms with the second floor soon to follow. The interior kitchen walls have been framed. The electricians and plumbers continue installing conduit and pipe.